P1-0&M-11/2024 Date:31-Aug-2024
|
Providing Train Operation and Station Control SeN ices for Pune Metro Rail Project for a period of 1 Year.
|
M/s Colossus Infra Projects Pvt Ltd
|
27-11-2024
|
INR 13,14,45,992/- including GST
|
P1-0&M-11/2024 Date:31-Aug-2024
|
Providing Train Operation and Station Control SeN ices for Pune Metro Rail Project for a period of 1 Year.
|
M/s Colossus Infra Projects Pvt Ltd
|
27-11-2024
|
INR 13,14,45,992/- including GST
|
P1-0&M-11/2024 Date:31-Aug-2024
|
Providing Train Operation and Station Control SeN ices for Pune Metro Rail Project for a period of 1 Year.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
27-11-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1A/DDC-03/2024(NCB) Dated: 19.07.2024
|
Detailed Design Consultancy Services for 2 (Two) Elevated Stations in Line 2A-Vanaz
to Chandni Chowk and for 11 (Eleven) Elevated Stations in Line 2B-Ramwadi to Wagholi excluding
Viaduct in station portions of Pune Metro Rail Project.
|
M/s Stup Consultants Private Limited in Consortium with RITES Ltd
|
11-10-2024
|
2,92,50,000 Exclusive GST
|
P1A/DDC-03/2024(NCB) Dated: 19.07.2024
|
Detailed Design Consultancy Services for 2 (Two) Elevated Stations in Line 2A-Vanaz
to Chandni Chowk and for 11 (Eleven) Elevated Stations in Line 2B-Ramwadi to Wagholi excluding
Viaduct in station portions of Pune Metro Rail Project.
|
M/s Stup Consultants Private Limited in Consortium with RITES Ltd
|
11-10-2024
|
2,92,50,000 Exclusive GST
|
P1A/DDC-03/2024(NCB) Dated: 19.07.2024
|
Detailed Design Consultancy Services for 2 (Two) Elevated Stations in Line 2A-Vanaz
to Chandni Chowk and for 11 (Eleven) Elevated Stations in Line 2B-Ramwadi to Wagholi excluding
Viaduct in station portions of Pune Metro Rail Project.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
11-10-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1-0&M-06R/2024 Date: 12-03-2024
|
Facility Management Service (FMS) for 14 Stations, Range Hill Depot and 16 Trainsets
of Line-1 (PCMC-Swargate) for Pune Metro Rail Project for providing the following: (a) Mechanized
Housekeeping, Cleaning Services (b) Ticketing (TOM/EFO) Services (c) Security Services for the period
of 03 (Three) years.
|
M/s Rajdeep Enterprises
|
10-10-2024
|
57,22,84,497 Including Gst
|
P1-0&M-06R/2024 Date: 12-03-2024
|
Facility Management Service (FMS) for 14 Stations, Range Hill Depot and 16 Trainsets
of Line-1 (PCMC-Swargate) for Pune Metro Rail Project for providing the following: (a) Mechanized
Housekeeping, Cleaning Services (b) Ticketing (TOM/EFO) Services (c) Security Services for the period
of 03 (Three) years.
|
M/s Rajdeep Enterprises
|
10-10-2024
|
57,22,84,497 Including Gst
|
P1-0&M-06R/2024 Date: 12-03-2024
|
Facility Management Service (FMS) for 14 Stations, Range Hill Depot and 16 Trainsets
of Line-1 (PCMC-Swargate) for Pune Metro Rail Project for providing the following: (a) Mechanized
Housekeeping, Cleaning Services (b) Ticketing (TOM/EFO) Services (c) Security Services for the period
of 03 (Three) years.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
10-10-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1C-24/2024 (ICB) Date:20 -02- 2024
|
Execution of balance Civil, Structural, Architectural, Plumbing & Site Development Works of Station Box Including Works of Entry-Exits at Range Hills and other stations of Pune Metro Rail Project .
|
Joint Venture of BBG Infrastructure Private Limited (Lead Member) and M/S YFC Projects Private Limited (JV of M/s BBG-YFC)
|
10-10-2024
|
83,21,51,762 Including Gst
|
P1C-24/2024 (ICB) Date:20 -02- 2024
|
Execution of balance Civil, Structural, Architectural, Plumbing & Site Development Works of Station Box Including Works of Entry-Exits at Range Hills and other stations of Pune Metro Rail Project .
|
Joint Venture of BBG Infrastructure Private Limited (Lead Member) and M/S YFC Projects Private Limited (JV of M/s BBG-YFC)
|
10-10-2024
|
83,21,51,762 Including Gst
|
P1C-24/2024 (ICB) Date:20 -02- 2024
|
Execution of balance Civil, Structural, Architectural, Plumbing & Site Development Works of Station Box Including Works of Entry-Exits at Range Hills and other stations of Pune Metro Rail Project .
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
10-10-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1/Misc-35/2024 Date: 03/08/2024
|
Consultancy Services for Implementation of Livelihood Restoration Plan for Civil Court Metro Station PAFs of PMRP
|
Consortium of M/s Society for Human Advancement and Progressive Education and M/s Automech Engineering India Pvt. Ltd
|
07-10-2024
|
4,12,95,139.58 Inclusive GST
|
P1/Misc-35/2024 Date: 03/08/2024
|
Consultancy Services for Implementation of Livelihood Restoration Plan for Civil Court Metro Station PAFs of PMRP
|
Consortium of M/s Society for Human Advancement and Progressive Education and M/s Automech Engineering India Pvt. Ltd
|
07-10-2024
|
4,12,95,139.58 Inclusive GST
|
P1/Misc-35/2024 Date: 03/08/2024
|
Consultancy Services for Implementation of Livelihood Restoration Plan for Civil Court Metro Station PAFs of PMRP
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
07-10-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
MAHA-METRO/PMRP/P&C/QUOT/2024/Sep/01
|
sealed Quotations are invited on behalf of Maha-Metro for the work of "Hiring of Print service for PMRP
office ", having prior experience in currying out similar works.
|
M/s Alpha ink Pvt Ltd
|
26-09-2024
|
74,340/- Incl GST
|
MAHA-METRO/PMRP/P&C/QUOT/2024/Sep/01
|
sealed Quotations are invited on behalf of Maha-Metro for the work of "Hiring of Print service for PMRP
office ", having prior experience in currying out similar works.
|
M/s Alpha ink Pvt Ltd
|
26-09-2024
|
74,340/- Incl GST
|
MAHA-METRO/PMRP/P&C/QUOT/2024/Sep/01
|
sealed Quotations are invited on behalf of Maha-Metro for the work of "Hiring of Print service for PMRP
office ", having prior experience in currying out similar works.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
26-09-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1A-TR-01/2024 Date: 13-03-2024
|
Height raising of existing 110 kv Lonavala Khadki Pune Single Circuit SE1 Overhead Railway Transmission Line between Metro Pier Location P444-P445, Work includes Engineering, supply, Erection, Testing, Commissioning And Dismantling of existing towers.
|
M/s MD Transcon Pvt Ltd
|
25-09-2024
|
3,61,22,501 Including Gst
|
P1A-TR-01/2024 Date: 13-03-2024
|
Height raising of existing 110 kv Lonavala Khadki Pune Single Circuit SE1 Overhead Railway Transmission Line between Metro Pier Location P444-P445, Work includes Engineering, supply, Erection, Testing, Commissioning And Dismantling of existing towers.
|
M/s MD Transcon Pvt Ltd
|
25-09-2024
|
3,61,22,501 Including Gst
|
P1A-TR-01/2024 Date: 13-03-2024
|
Height raising of existing 110 kv Lonavala Khadki Pune Single Circuit SE1 Overhead Railway Transmission Line between Metro Pier Location P444-P445, Work includes Engineering, supply, Erection, Testing, Commissioning And Dismantling of existing towers.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
25-09-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
MAHA-METRO/PMRP/PROC/Quot/ Date: 09 July 2024
|
Hiring of consultant towards obtaining Consent to Establish (CTE) for Pune Metro Rail Project.
|
M/s Mahabal Enviro Engineers Pvt Ltd
|
19-08-2024
|
4,72,000/- Incl GST
|
MAHA-METRO/PMRP/PROC/Quot/ Date: 09 July 2024
|
Hiring of consultant towards obtaining Consent to Establish (CTE) for Pune Metro Rail Project.
|
M/s Mahabal Enviro Engineers Pvt Ltd
|
19-08-2024
|
4,72,000/- Incl GST
|
MAHA-METRO/PMRP/PROC/Quot/ Date: 09 July 2024
|
Hiring of consultant towards obtaining Consent to Establish (CTE) for Pune Metro Rail Project.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
19-08-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1A-PC 01/2024 Dated: 07 June 2024
|
Appointment of Proof Checking Consultant for Detailed Structural Design of Viaduct of PCMC to Nigdi Corridor (4.52 km approx.) of Pune Metro Rail Project.
|
M/s Structcon Designs Pvt Ltd.
|
31-07-2024
|
75,00,000 Exl GST
|
P1A-PC 01/2024 Dated: 07 June 2024
|
Appointment of Proof Checking Consultant for Detailed Structural Design of Viaduct of PCMC to Nigdi Corridor (4.52 km approx.) of Pune Metro Rail Project.
|
M/s Structcon Designs Pvt Ltd.
|
31-07-2024
|
75,00,000 Exl GST
|
P1A-PC 01/2024 Dated: 07 June 2024
|
Appointment of Proof Checking Consultant for Detailed Structural Design of Viaduct of PCMC to Nigdi Corridor (4.52 km approx.) of Pune Metro Rail Project.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
31-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1-ADM-10/2024 Date:11.03.2024
|
Appointment of an Agency for Air Ticket booking(Domestic & International) Services for MAHA-Metro officials
|
M/s Grand Skies Travels Private Limited
|
26-07-2024
|
2,04,500 Exl GST
|
P1-ADM-10/2024 Date:11.03.2024
|
Appointment of an Agency for Air Ticket booking(Domestic & International) Services for MAHA-Metro officials
|
M/s Grand Skies Travels Private Limited
|
26-07-2024
|
2,04,500 Exl GST
|
P1-ADM-10/2024 Date:11.03.2024
|
Appointment of an Agency for Air Ticket booking(Domestic & International) Services for MAHA-Metro officials
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
26-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1-0&M-04R/2024 Date:07-Mar-2024
|
Outsourcing of Maintenance Services of OHE & Power Supply for One Year for 85 TKM OHE, 2 Depots,33 Stations ASS& 3 RSSof Pune Metro Rail Project.
|
M/s Vaibhav Construction Company
|
26-07-2024
|
24,49,000 Excl GST
|
P1-0&M-04R/2024 Date:07-Mar-2024
|
Outsourcing of Maintenance Services of OHE & Power Supply for One Year for 85 TKM OHE, 2 Depots,33 Stations ASS& 3 RSSof Pune Metro Rail Project.
|
M/s Vaibhav Construction Company
|
26-07-2024
|
24,49,000 Excl GST
|
P1-0&M-04R/2024 Date:07-Mar-2024
|
Outsourcing of Maintenance Services of OHE & Power Supply for One Year for 85 TKM OHE, 2 Depots,33 Stations ASS& 3 RSSof Pune Metro Rail Project.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
26-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1-IT-04/2024 Date:12-03-2024
|
Design, Supply, Installation, Testing & Commissioning of Telecom System at Metro Bhavan, Pune.
|
M/s Heinrich Corporation India Pvt Ltd
|
19-07-2024
|
10,86,73,982 Incl GST
|
P1-IT-04/2024 Date:12-03-2024
|
Design, Supply, Installation, Testing & Commissioning of Telecom System at Metro Bhavan, Pune.
|
M/s Heinrich Corporation India Pvt Ltd
|
19-07-2024
|
10,86,73,982 Incl GST
|
P1-IT-04/2024 Date:12-03-2024
|
Design, Supply, Installation, Testing & Commissioning of Telecom System at Metro Bhavan, Pune.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
19-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1A-Consul-01R/2024 Date: 06/03/2024
|
Consultancy Services for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for North-South corridor of Pune Metro Rail Project Phase-1 Extension (PCMC to NIGDI and SWARGATE TO KATRAJ.
|
M/s MITCON Consultancy and Engineering Services Limited
|
01-07-2024
|
29,25,000 excluding GST
|
P1A-Consul-01R/2024 Date: 06/03/2024
|
Consultancy Services for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for North-South corridor of Pune Metro Rail Project Phase-1 Extension (PCMC to NIGDI and SWARGATE TO KATRAJ.
|
M/s MITCON Consultancy and Engineering Services Limited
|
01-07-2024
|
29,25,000 excluding GST
|
P1A-Consul-01R/2024 Date: 06/03/2024
|
Consultancy Services for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for North-South corridor of Pune Metro Rail Project Phase-1 Extension (PCMC to NIGDI and SWARGATE TO KATRAJ.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
01-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1-O&M-09/2024 Dated: 06.03.2024
|
"Outsourcing of PMRP Track Maintenance Services of Operational assets of Ballastless, Ballasted Track of Mainline & 2 No's Depots for period of One Year and Extendable to One Year"
|
M/s Apurvakriti Infrastructure Pvt Ltd
|
01-07-2024
|
97,92,012.71 Incl GST
|
P1-O&M-09/2024 Dated: 06.03.2024
|
"Outsourcing of PMRP Track Maintenance Services of Operational assets of Ballastless, Ballasted Track of Mainline & 2 No's Depots for period of One Year and Extendable to One Year"
|
M/s Apurvakriti Infrastructure Pvt Ltd
|
01-07-2024
|
97,92,012.71 Incl GST
|
P1-O&M-09/2024 Dated: 06.03.2024
|
"Outsourcing of PMRP Track Maintenance Services of Operational assets of Ballastless, Ballasted Track of Mainline & 2 No's Depots for period of One Year and Extendable to One Year"
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
01-07-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1O&M-08/2024 Date: 14 Feb 2024
|
Civil Maintenance of Operational Elevated & Under Ground Stations, Viaduct and Two Depots
of Pune Metro Rail Project of Maha-Metro for a period of one year.
|
M/s Yash Kirti Developers and Contractor
|
10-05-2024
|
68,01,110 Incl GST
|
P1O&M-08/2024 Date: 14 Feb 2024
|
Civil Maintenance of Operational Elevated & Under Ground Stations, Viaduct and Two Depots
of Pune Metro Rail Project of Maha-Metro for a period of one year.
|
M/s Yash Kirti Developers and Contractor
|
10-05-2024
|
68,01,110 Incl GST
|
P1O&M-08/2024 Date: 14 Feb 2024
|
Civil Maintenance of Operational Elevated & Under Ground Stations, Viaduct and Two Depots
of Pune Metro Rail Project of Maha-Metro for a period of one year.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
10-05-2024
|
INR 18,47,01,942.00
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
M/s Johnson Lifts Private Limited (Lot - 1)
|
30-09-2019
|
INR 52,01,25,656.00 ( Lot - 1)
|
P1EG-01/2019 Dt.23.01.2019
|
DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HEAVY DUTY MACHINE ROOM LESS ELEVATORS & ESCALATOR FOR PUNE METRO RAIL PROJECT
|
Consortium of Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. (Lot - 2)
|
30-09-2019
|
INR 122,56,29,398 (Lot -2)
|
P1A-C-01/2023 Date: 15 Dec 2023
|
Design and Construction of Elevated Viaduct of Length 4.519 Kms from CH: (-)1079.899m to CH: (-)5599.298m between PCMC and NIGDI (Bhakti Shakti) on the North-South Corridor of Pune Metro Rail Project- Reach1 – Extension.
|
M/s Rail Vikas Nigam Limited.
|
15-03-2024
|
339,23,39,132 (Including GST)
|
P1A-C-01/2023 Date: 15 Dec 2023
|
Design and Construction of Elevated Viaduct of Length 4.519 Kms from CH: (-)1079.899m to CH: (-)5599.298m between PCMC and NIGDI (Bhakti Shakti) on the North-South Corridor of Pune Metro Rail Project- Reach1 – Extension.
|
M/s Rail Vikas Nigam Limited.
|
15-03-2024
|
339,23,39,132 (Including GST)
|
P1A-C-01/2023 Date: 15 Dec 2023
|
Design and Construction of Elevated Viaduct of Length 4.519 Kms from CH: (-)1079.899m to CH: (-)5599.298m between PCMC and NIGDI (Bhakti Shakti) on the North-South Corridor of Pune Metro Rail Project- Reach1 – Extension.
|
M/s Jindal Steel & Power Ltd. (3000 MT)
|
15-03-2024
|
|