Tender Notice No Name of the Work Submission Date Opening Date NIT/Tender
P1/TR-02/2018 Dt. 06.03.2018 DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25KV FLEXIBLE & RIGID OVERHEAD CATENARY SYSTEM (OCS / OHE) AND SECTIONING POSTS FOR PUNE METRO RAIL PROJECT. 21-06-2018 16:00:00 Hrs 21-06-2018 16:30:00 Hrs
Notice Inviting Tender
P1/TR-01/2018 Dt. 26.02.2018 Design, supply, installation, testing and commissioning of receiving cum auxiliary main cum traction substations including high voltage cabling from grid substation, 33 kv cable network, Ass & SCADA system for Pune metro rail project 20-06-2018 16:00:00 Hrs 20-06-2018 16:30:00 Hrs
Notice Inviting Tender
P1/S01/2018. (ICB) Dt. 05.01.2018 DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNALLING AND TRAIN CONTROL SYSTEM AT PUNE METRO RAIL PROJECT. 13-06-2018 16:00:00 Hrs 13-06-2018 16:30:00 Hrs
Notice Inviting Tender
Tender Notice No Name of the Work Submission Date Opening Date
P1C-05/2018 DT. 17.02.2018 CONSTRUCTION OF METRO CORRIDOR OF LENGTH 7.715 KM WHICH INCLUDES : 1. DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH 6.776 KM FROM CH:6525 TO CH:6785, CH:7215 TO CH:10105 AND CH:10614 TO CH:14240.0 BETWEEN CIVIL COURT AND RAMWADI AND 2. CONSTRUCTION OF ELEVATED VIADUCT ON BOQ BASIS OF LENGTH 0.430 KM FROM CH:6785 TO CH:7215 NEAR SANGAM BRIDGE AND LENGTH 0.509 KM FROM CH:10105 TO CH:10614 NEAR BUND GARDEN ON CORRIDOR -2 OF PUNE METRO RAIL PROJECT. 19-04-2018 19:00:00 Hrs 19-04-2018 19:00:00 Hrs
Tender Notice No Name of the Work Awarded To Date Of Award
P1UG-04/2018 Dt. 10.01.2018 1. Construction of Underground shafts for tunnelling at Agricultural College and KEY DETAILS : Swargate; 2. Swargate Metro Station; 3. Multi-modal Integration at Swargate Metro Station; and R&R facilities. M/s J Kumar Infraprojects Limited 02-05-2018
P1Horti-02/2018 Dt. 20.01.2018 TRANSPLANTATION OF Approx. 193 TREES in the Jurisdiction (PCMC-Harris Bridge) of Reach-1 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 23-04-2018
P1Horti-01/2018 Dt. 20.01.2018 Transplantation of Approx. 200 Trees for Reach-1 & Reach-2 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 10-04-2018
P1Consul-05/2017 Consultancy Services for Land Acquisition for Pune Metro Rail Project, Phase-I M/s Monarch Surveyors & Engineering Consultants Pvt. Ltd. 19-01-2018
P1-N&VS-01/2017 NOISE AND VIBRATION STUDY FOR PUNE METRO RAIL PROJECT FOR PHASE - I M/s Central Road Research Institute 04-01-2018
P1C-04/2017 Dt. 19.07.2017 Construction of Eight (08) Nos. Elevated Metro Rail Stations Excluding Viaduct in Station Portion viz. Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan, Sambhaji Park & PMC on Corridor-2 (E-W Corridor) of Pune Metro Rail Project M/s HCC – AL FARA’A Joint Venture 04-01-2018
P1C-03/2017 Dt. 07.05.2017 Construction Of Nine (09) Nos. Elevated Metro Stations Excluding Viaduct Viz. PimpriChinchwad Municipal Corporation, Tukaram Nagar, Bhosari, Kasarwadi, Phugewadi, Dapodi, Bopodi, Khadki And Range Hill On Corridor-1 Of Pune Metro Rail Project. M/s HCC – AL FARA’A Joint Venture 01-11-2017
P1Misc-01/2017 Dt. 13.06.2017 Miscellaneous Works such as Shifting of Civil Utilities, Construction, Repair & maintenance of roads & drains, Demolition/Dismantling/Repair of old small Buildings, Construction of new small Buildings & Architectural Finishing Works, PHE works, Boundary Walls and any other Work assigned by Maha-Metro officials based on PWD SOR (Pune Region) for Pune Metro Rail Project (Phase-I) of Maharashtra Metro Rail Corporation Ltd. M/s Venus Buildtech India Pvt. Ltd. 14-09-2017
P1DDC-02/2017 Dt. 29.06.2017 Detailed Design Consultancy Services for 12 (Twelve) Elevated Stations viz Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Mangalwar Peth, Pune Railway Station, Ruby Hall, Bund Garden, Yerawada, Kalyani Nagar and Ramwadi Excluding Viaduct in station portion on Corridor-2 of Pune Metro Rail Project. Consortium of M/s LKT Engineering Consultants Ltd. & M/s Architect Hafeez Contractor 14-09-2017
P1C-02/2017 Dt. 07.04.2017 (Recall) Design and Construction of Elevated Viaduct of Length 7.150 Kms from CH:(-)625 to CH:6525 between Vanaz and Civil Court on the East-West Corridor of Pune Metro Rail Project M/s NCC Limited 16-08-2017
P1SIA-01/2017 Dt. 26.04.2017 Appointment of Consultant for Carrying out “Social Impact Assessment (SIA) study and preparation of Social Management Implementation Plan, Rehabilitation & Resettlement (RR Policy) Plan” for Pune Metro Rail Project Consortium of M/s Centre for Market Research & Social Development Pvt. Ltd. and M/s Manavadhikar Samajik Manch. 24-07-2017
P1Consul-03/2017 Dt. 20.04.2017 Detailed Design Consultancy Services for 9 (Nine) Elevated Stations from PCMC to Range Hill Excluding Viaduct in Station Portion on Corridor-1 of Pune Metro Rail Project. M/s AYESA Ingenieria y Arquitectura, S.A.U (Ayesa) 22-07-2017
P1Consul-02/2017 Dt. 08.04.2017 Appointment of Consultant for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for both the corridors (North-South and East-West) of Pune Metro Rail Project M/s RITES Limited 03-06-2017
P1Consul-01/2017 Dt. 24.02.2017 APPOINTMENT OF CONSULTANT FOR CARRYING OUT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND HYDRAULIC STUDIES OF RIVER WITH REFERENCE TO THE PUNE METRO RAIL ALIGNMENT (1.7 KM) PASSING THROUGH MUTHA RIVER AND SUGGEST MEASURES TO MITIGATE THE SIDE EFFECTS. M/s MITCON Consultancy and Engineering Services Limited 13-05-2017
P1C-01/2017 Dt. 25.02.2017 Construction of Metro Corridor of Length 10.795 Km which includes: Design and Construction of Elevated Viaduct of Length 9.250 Kms from CH:(-)540 to CH:2600, CH:3600 to CH:6694, CH:7124 to CH:7709, CH:7737 to CH:8604 & CH:8691 to Ch:10255 between Pimpri Chinchwad Municipal Corporation and Range Hill and Construction of Elevated Viaduct on BOQ basis of Length 430m from CH:6694 to CH:7124 Near Harris Bridge, 1.000 Km from CH:2600 to CH:3600, 28m from CH:7709 to CH:7737 and 87m from CH:8604 to CH:8691 on the North-South Corridor of Pune Metro Rail Project. M/s NCC Limited 03-05-2017