Tenders

Sale of Document, E-Payment procedure, submission and other details are available on Maha-Metro Rail tender portal "https://mahametrorail.etenders.in"

Tender Notice No Name of the Work Submission Date Opening Date NIT/Tender
P1M&P-01/2018 Dt. 08.10.2018 DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE MAINTENANCE SERVICES (CMS) OF MACHINERY AND PLANTS FOR 02 (TWO) NUMBERS OF ROLLING STOCK DEPOTS AT RANGE HILL AND VANAZ OF PUNE METRO RAIL PROJECT AND TRAINING OF PERSONNEL 15-03-2019 16:00:00 Hrs 15-03-2019 16:30:00 Hrs
Notice Inviting Tender
P1/UGC03/2019 DT. 08.01.2019 DESIGN VERIFICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING & COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT (CAMC) FOR 5 YEARS OF TUNNEL VENTILATION SYSTEM (TVS), TVS-SCADA, ENVIRONMENTAL CONTROL SYSTEM (ECS), ECS AND E&M-SCADA, LV POWER SYSTEM IN ASS FOR UNDERGROUND SECTION (SHIVAJI NAGAR, CIVIL COURT, BUDHWAR PETH, MANDAI AND SWARGATE) OF PUNE METRO RAIL PROJECT. 15-03-2019 16:00:00 Hrs 15-03-2019 16:30:00 Hrs
Notice Inviting Tender
P1/RS-01/2018 (ICB) DATE. 28.07.2018 DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS) AND TRAINING OF PERSONNEL AT PUNE METRO RAIL PROJECT 01-03-2019 16:00:00 Hrs 01-03-2019 16:30:00 Hrs
Notice Inviting Tender
P1TL-01/2018 Dt. 27 .07 .2018 Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System 28-02-2019 16:00:00 Hrs 28-02-2019 16:30:00 Hrs
Notice Inviting Tender
P1-T05A/2019 DT. 05/01/2019 Design, Supply, Installation, Testing and Commissioning of Standard Gauge Ballasted Track in Range Hill Depot and Ballastless Track for the Elevated Section of Reach-1 (Pimpri Chinchwad Municipal Corporation (PCMC) to Range Hill) of Pune Metro Rail Project 23-02-2019 16:00:00 Hrs 23-02-2019 16:00:00 Hrs
Notice Inviting Tender
P1-T05B/2019 DT. 05/01/2019 Design, Supply, Installation, Testing and Commissioning of Standard Gauge Ballasted Track in Vanaz Depot and Ballastless Track for the Elevated Sections of Reach-2 (Vanaz to Civil Court) of Pune Metro Rail Project 23-02-2019 16:00:00 Hrs 23-02-2019 16:00:00 Hrs
Notice Inviting Tender
Tender Notice No Name of the Work Submission Date Opening Date
P1PR-02/2019 DATED: 16.01.2019 PRODUCTION OF SHORT FILMS (10 EPISODES) FOR MAHARASHTRA METRO RAIL CORPORATION LIMITED (PUNE METRO RAIL PROJECT)
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
06-02-2019 16:00:00 Hrs 06-02-2019 16:30:00 Hrs
P1-T04/2018 Dt.06.12.2018 Supply of Fastening System for Ballastless Track for North-South Corridor-1 and East-West Corridor-2 including Connectivity to Depot (Vanaz & Range Hill) of Pune Metro Rail Project.
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
01-02-2019 16:00:00 Hrs 01-02-2019 16:30:00 Hrs Corrigendum IV is uploaded
P1-T01/2018 DT. 03.11.2018 SUPPLY OF 9000 MT 60E1 (UIC 60), 1080 GRADE HEAD HARDENED (HH) RAILS AS PER IRS T-12, 2009 FOR PUNE METRO RAIL PROJECT
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
31-01-2019 16:00:00 Hrs 31-01-2019 16:30:00 Hrs Corrigendum X is uploaded
P1/TR-01/2018 Dt. 26.02.2018 Design, supply, installation, testing and commissioning of receiving cum auxiliary main cum traction substations including high voltage cabling from grid substation, 33 kv cable network, Ass & SCADA system for Pune metro rail project
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
21-01-2019 16:00:00 Hrs 21-01-2019 16:30:00 Hrs Corrigendum XX is uploaded
P1PR-01/2018 Dated: 03.12.2018 Empanelment of Advertising cum Public Relation (PR) Agency for Maharashtra Metro Rail Corporation Limited (Pune Metro Rail Project)
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
29-12-2018 16:00:00 Hrs 29-12-2018 16:30:00 Hrs 101, The Orion, Opposite Don Bosco Youth Centre, Koregaon Park, Pune- 411001.
P1-T05/2018 DT. 06/08/2018 DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BALLASTLESS TRACK OF STANDARD GAUAGE, FOR THE ELEVATED CORRIDOR OF REACH - 1 (PIMPRI CHINCHWAD MUNICIPAL CORPORATION (PCMC) TO RANGE HILL) AND REACH - 2 (VANAZ TO CIVIL COURT) SECTIONS OF PUNE METRO RAIL PROJECT
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
22-11-2018 16:00:00 Hrs 22-11-2018 16:00:00 Hrs Corrigendum IX is uploaded
MAHA-METRO/PMRP/Reach-3/Shayog Kendra/2018 Dated:2 Erection of 01(One) no of Shayog Kendra for Pune Metro Rail Project (with Base Price = Rs. 08,66,543.80 as BOQ : Annexure A)
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
12-11-2018 15:30:00 Hrs 12-11-2018 15:30:00 Hrs
P1-T02/2018 DT. 11.09.2018 SUPPLY OF 1800 MT 90 UTS RAILS, UIC 60, IRS-T-12-2009, 880 GRADE FOR PUNE METRO RAIL PROJECT
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
06-11-2018 16:00:00 Hrs 06-11-2018 16:30:00 Hrs Corrigendum IV is uploaded
ICB –P1-T03/2018 Dt. 21/08/2018 Design, Manufacturing & Supply of Standard Gauge 60E 1 (UIC 60) Turnouts for Pune Metro Rail Project.
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
15-10-2018 16:00:00 Hrs 15-10-2018 17:00:00 Hrs Corrigendum II is uploaded
P1ADM-03/2018 DATED: 04.09.2018 HIRING OF VEHICLES (TAXIES) FOR OFFICIALS OF MAHARASHTRA METRO RAIL CORPORATION LIMITED (PUNE METRO RAILPROJECT)
Technical Bid Evaluation Result. Financial Bid Evaluation Result
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
Technical Bid Evaluation Result. Financial Bid Evaluation Result.
29-09-2018 18:00:00 Hrs 29-09-2018 18:30:00 Hrs
Tender Notice No Name of the Work Awarded To Date Of Award
P1UGC-02/2018 Dt. 09.06.2018 Design and Construction of Underground Stations at Budhwar Peth, Mandai and Swargate and Associated Tunnels on the North-South Corridor of Pune Metro Rail Project. M/S GULERMAK – TPL PUNE METRO JOINT VENTURE 18-02-2019 ₹ 0
P1C-07/2018 Dt. 16.07.2018 CONSTRUCTION OF 2 Nos. ROLLING STOCK DEPOTS AT RANGE HILL & VANAZ INCLUDING CIVIL AND E&M WORKS FOR PUNE METRO RAIL PROJECT. M/s URC Construction Private 29-01-2019 ₹ 3,77,90,19,062
P1/TR-02/2018 Dt. 06.03.2018 DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25KV FLEXIBLE & RIGID OVERHEAD CATENARY SYSTEM (OCS / OHE) AND SECTIONING POSTS FOR PUNE METRO RAIL PROJECT. Consortium of Alstom Transport India Limited and Alstom Transport SA 29-01-2019 ₹ 0
P1C-06/2018 Dt. 09.07.2018 CONSTRUCTION OF SEVEN (07) NOS. ELEVATED METRO RAIL STATIONS EXCLUDING VIADUCT VIZ. RAMWADI, KALYANI NAGAR, YERAWADA, BUND GARDEN, RUBY HALL CLINIC, PUNE STN & MANGALWARPETH ON REACH-3 OF PUNE METRO RAIL PROJECT. M/s AFCONS – SPCPL Joint Venture, 22-01-2019 ₹ 4,70,43,41,601
P1/S01/2018. (ICB) Dt. 05.01.2018 DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNALLING AND TRAIN CONTROL SYSTEM AT PUNE METRO RAIL PROJECT. Consortium of Alstom Transport India Limited and Alstom Transport S A 05-01-2019 ₹ 0
P1ADM-04/2018 DATED : 06.11.2018 HIRING OF VEHICLES (TAXIES) FOR OFFICIALS OF MAHARASHTRA METRO RAIL CORPORATION LIMITED (PUNE METRO RAIL PROJECT) M/s MALATI TRAVELS & M/s Berggruen Car Rental Pvt Ltd 29-12-2018 ₹ 0
P1UGC-01/2018 Dt. 24.05.2018 Design and Construction of Underground stations viz. Shivajinagar and Civil Court and tunnels between Agriculture college and Northern End of Budhwar Peth Station on the North-South Corridor of Pune Metro Rail Project. M/S GULERMAK – TPL PUNE METRO JOINT VENTURE 01-12-2018 ₹ 8,64,71,39,476
P1/TR-04/2018 Dt. 31.05.2018 SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25KV FLEXIBLE OVERHEAD CATENARY SYSTEM (OCS / OHE) ALONG WITH 22/25 KV RSS/TSS FOR PRIORITY SECTION (PCMC TO PHUGEWADI) OF PUNE METRO RAIL PROJECT M/s Bright Power Projects (India) Private Limited 12-11-2018 ₹ 29,21,83,893
P1C-05/2018 DT. 16.02.2018 CONSTRUCTION OF METRO CORRIDOR OF LENGTH 7.657 KM WHICH INCLUDES: 1. DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH 7.578 KM FROM CH:6688.652 TO CH:6817 AND CH:6896 TO CH:14346.0 BETWEEN CIVIL COURT AND RAMWADI & 2. CONSTRUCTION OF ELEVATED VIADUCT ON BOQ BASIS OF LENGTH 0.079 KM FROM CH:6817 TO CH:6896 NEAR SANGAM BRIDGE ON CORRIDOR-2 OF PUNE METRO RAIL PROJECT" M/s J Kumar Infraprojects Limited 02-08-2018 ₹ 3,88,58,55,150
P1UG-04/2018 Dt. 10.01.2018 1. Construction of Underground shafts for tunnelling at Agricultural College and KEY DETAILS : Swargate; 2. Swargate Metro Station; 3. Multi-modal Integration at Swargate Metro Station; and R&R facilities. M/s J Kumar Infraprojects Limited 02-05-2018 ₹ 2,22,33,28,303
P1Horti-02/2018 Dt. 20.01.2018 TRANSPLANTATION OF Approx. 193 TREES in the Jurisdiction (PCMC-Harris Bridge) of Reach-1 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 23-04-2018 ₹ 1,30,50,600
P1Horti-01/2018 Dt. 20.01.2018 Transplantation of Approx. 200 Trees for Reach-1 & Reach-2 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 10-04-2018 ₹ 98,00,000
P1Consul-05/2017 Consultancy Services for Land Acquisition for Pune Metro Rail Project, Phase-I M/s Monarch Surveyors & Engineering Consultants Pvt. Ltd. 19-01-2018 ₹ 81,16,988
P1C-04/2017 Dt. 19.07.2017 Construction of Eight (08) Nos. Elevated Metro Rail Stations Excluding Viaduct in Station Portion viz. Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan, Sambhaji Park & PMC on Corridor-2 (E-W Corridor) of Pune Metro Rail Project M/s HCC – AL FARA’A Joint Venture 04-01-2018 ₹ 4,83,98,88,949
P1-N&VS-01/2017 NOISE AND VIBRATION STUDY FOR PUNE METRO RAIL PROJECT FOR PHASE - I M/s Central Road Research Institute 04-01-2018 ₹ 45,00,000
P1C-03/2017 Dt. 07.05.2017 Construction Of Nine (09) Nos. Elevated Metro Stations Excluding Viaduct Viz. PimpriChinchwad Municipal Corporation, Tukaram Nagar, Bhosari, Kasarwadi, Phugewadi, Dapodi, Bopodi, Khadki And Range Hill On Corridor-1 Of Pune Metro Rail Project. M/s HCC – AL FARA’A Joint Venture 01-11-2017 ₹ 4,97,09,15,237
P1Misc-01/2017 Dt. 13.06.2017 Miscellaneous Works such as Shifting of Civil Utilities, Construction, Repair & maintenance of roads & drains, Demolition/Dismantling/Repair of old small Buildings, Construction of new small Buildings & Architectural Finishing Works, PHE works, Boundary Walls and any other Work assigned by Maha-Metro officials based on PWD SOR (Pune Region) for Pune Metro Rail Project (Phase-I) of Maharashtra Metro Rail Corporation Ltd. M/s Venus Buildtech India Pvt. Ltd. 14-09-2017 ₹ 12,97,41,483
P1DDC-02/2017 Dt. 29.06.2017 Detailed Design Consultancy Services for 12 (Twelve) Elevated Stations viz Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Mangalwar Peth, Pune Railway Station, Ruby Hall, Bund Garden, Yerawada, Kalyani Nagar and Ramwadi Excluding Viaduct in station portion on Corridor-2 of Pune Metro Rail Project. Consortium of M/s LKT Engineering Consultants Ltd. & M/s Architect Hafeez Contractor 14-09-2017 ₹ 4,79,88,000
P1C-02/2017 Dt. 07.04.2017 (Recall) Design and Construction of Elevated Viaduct of Length 7.150 Kms from CH:(-)625 to CH:6525 between Vanaz and Civil Court on the East-West Corridor of Pune Metro Rail Project M/s NCC Limited 16-08-2017 ₹ 3,48,20,00,000
P1SIA-01/2017 Dt. 26.04.2017 Appointment of Consultant for Carrying out “Social Impact Assessment (SIA) study and preparation of Social Management Implementation Plan, Rehabilitation & Resettlement (RR Policy) Plan” for Pune Metro Rail Project Consortium of M/s Centre for Market Research & Social Development Pvt. Ltd. and M/s Manavadhikar Samajik Manch. 24-07-2017 ₹ 16,80,000
P1Consul-03/2017 Dt. 20.04.2017 Detailed Design Consultancy Services for 9 (Nine) Elevated Stations from PCMC to Range Hill Excluding Viaduct in Station Portion on Corridor-1 of Pune Metro Rail Project. M/s AYESA Ingenieria y Arquitectura, S.A.U (Ayesa) 22-07-2017 ₹ 4,95,28,179
P1Consul-02/2017 Dt. 08.04.2017 Appointment of Consultant for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for both the corridors (North-South and East-West) of Pune Metro Rail Project M/s RITES Limited 03-06-2017 ₹ 76,24,762
P1Consul-01/2017 Dt. 24.02.2017 APPOINTMENT OF CONSULTANT FOR CARRYING OUT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND HYDRAULIC STUDIES OF RIVER WITH REFERENCE TO THE PUNE METRO RAIL ALIGNMENT (1.7 KM) PASSING THROUGH MUTHA RIVER AND SUGGEST MEASURES TO MITIGATE THE SIDE EFFECTS. M/s MITCON Consultancy and Engineering Services Limited 13-05-2017 ₹ 1,24,90,000
P1C-01/2017 Dt. 25.02.2017 Construction of Metro Corridor of Length 10.795 Km which includes: Design and Construction of Elevated Viaduct of Length 9.250 Kms from CH:(-)540 to CH:2600, CH:3600 to CH:6694, CH:7124 to CH:7709, CH:7737 to CH:8604 & CH:8691 to Ch:10255 between Pimpri Chinchwad Municipal Corporation and Range Hill and Construction of Elevated Viaduct on BOQ basis of Length 430m from CH:6694 to CH:7124 Near Harris Bridge, 1.000 Km from CH:2600 to CH:3600, 28m from CH:7709 to CH:7737 and 87m from CH:8604 to CH:8691 on the North-South Corridor of Pune Metro Rail Project. M/s NCC Limited 03-05-2017 ₹ 4,99,01,00,528
Tender Notice No Name of the Work Awarded To LOI Date Awarded Amount Documents
P1UGC-02/2018 Dt. 09.06.2018 Design and Construction of Underground Stations at Budhwar Peth, Mandai and Swargate and Associated Tunnels on the North-South Corridor of Pune Metro Rail Project. M/S GULERMAK – TPL PUNE METRO JOINT VENTURE 18-02-2019 ₹ 0 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1C-07/2018 Dt. 16.07.2018 CONSTRUCTION OF 2 Nos. ROLLING STOCK DEPOTS AT RANGE HILL & VANAZ INCLUDING CIVIL AND E&M WORKS FOR PUNE METRO RAIL PROJECT. M/s URC Construction Private 29-01-2019 ₹ 3,77,90,19,062 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1/TR-02/2018 Dt. 06.03.2018 DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25KV FLEXIBLE & RIGID OVERHEAD CATENARY SYSTEM (OCS / OHE) AND SECTIONING POSTS FOR PUNE METRO RAIL PROJECT. Consortium of Alstom Transport India Limited and Alstom Transport SA 29-01-2019 ₹ 0 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1C-06/2018 Dt. 09.07.2018 CONSTRUCTION OF SEVEN (07) NOS. ELEVATED METRO RAIL STATIONS EXCLUDING VIADUCT VIZ. RAMWADI, KALYANI NAGAR, YERAWADA, BUND GARDEN, RUBY HALL CLINIC, PUNE STN & MANGALWARPETH ON REACH-3 OF PUNE METRO RAIL PROJECT. M/s AFCONS – SPCPL Joint Venture, 22-01-2019 ₹ 4,70,43,41,601 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1/S01/2018. (ICB) Dt. 05.01.2018 DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNALLING AND TRAIN CONTROL SYSTEM AT PUNE METRO RAIL PROJECT. Consortium of Alstom Transport India Limited and Alstom Transport S A 05-01-2019 ₹ 0 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1ADM-04/2018 DATED : 06.11.2018 HIRING OF VEHICLES (TAXIES) FOR OFFICIALS OF MAHARASHTRA METRO RAIL CORPORATION LIMITED (PUNE METRO RAIL PROJECT) M/s MALATI TRAVELS & M/s Berggruen Car Rental Pvt Ltd 29-12-2018 ₹ 0 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1UGC-01/2018 Dt. 24.05.2018 Design and Construction of Underground stations viz. Shivajinagar and Civil Court and tunnels between Agriculture college and Northern End of Budhwar Peth Station on the North-South Corridor of Pune Metro Rail Project. M/S GULERMAK – TPL PUNE METRO JOINT VENTURE 01-12-2018 ₹ 8,64,71,39,476 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1/TR-04/2018 Dt. 31.05.2018 SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 25KV FLEXIBLE OVERHEAD CATENARY SYSTEM (OCS / OHE) ALONG WITH 22/25 KV RSS/TSS FOR PRIORITY SECTION (PCMC TO PHUGEWADI) OF PUNE METRO RAIL PROJECT M/s Bright Power Projects (India) Private Limited 12-11-2018 ₹ 29,21,83,893 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1C-05/2018 DT. 16.02.2018 CONSTRUCTION OF METRO CORRIDOR OF LENGTH 7.657 KM WHICH INCLUDES: 1. DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH 7.578 KM FROM CH:6688.652 TO CH:6817 AND CH:6896 TO CH:14346.0 BETWEEN CIVIL COURT AND RAMWADI & 2. CONSTRUCTION OF ELEVATED VIADUCT ON BOQ BASIS OF LENGTH 0.079 KM FROM CH:6817 TO CH:6896 NEAR SANGAM BRIDGE ON CORRIDOR-2 OF PUNE METRO RAIL PROJECT" M/s J Kumar Infraprojects Limited 02-08-2018 ₹ 3,88,58,55,150 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1UG-04/2018 Dt. 10.01.2018 1. Construction of Underground shafts for tunnelling at Agricultural College and KEY DETAILS : Swargate; 2. Swargate Metro Station; 3. Multi-modal Integration at Swargate Metro Station; and R&R facilities. M/s J Kumar Infraprojects Limited 02-05-2018 ₹ 2,22,33,28,303 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Horti-02/2018 Dt. 20.01.2018 TRANSPLANTATION OF Approx. 193 TREES in the Jurisdiction (PCMC-Harris Bridge) of Reach-1 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 23-04-2018 ₹ 1,30,50,600 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Horti-01/2018 Dt. 20.01.2018 Transplantation of Approx. 200 Trees for Reach-1 & Reach-2 of Pune Metro Rail Project. M/s Green Morning Horti Culture Pvt. Ltd 10-04-2018 ₹ 98,00,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Consul-05/2017 Consultancy Services for Land Acquisition for Pune Metro Rail Project, Phase-I M/s Monarch Surveyors & Engineering Consultants Pvt. Ltd. 19-01-2018 ₹ 81,16,988 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1C-04/2017 Dt. 19.07.2017 Construction of Eight (08) Nos. Elevated Metro Rail Stations Excluding Viaduct in Station Portion viz. Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan, Sambhaji Park & PMC on Corridor-2 (E-W Corridor) of Pune Metro Rail Project M/s HCC – AL FARA’A Joint Venture 04-01-2018 ₹ 4,83,98,88,949 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1-N&VS-01/2017 NOISE AND VIBRATION STUDY FOR PUNE METRO RAIL PROJECT FOR PHASE - I M/s Central Road Research Institute 04-01-2018 ₹ 45,00,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
P1C-03/2017 Dt. 07.05.2017 Construction Of Nine (09) Nos. Elevated Metro Stations Excluding Viaduct Viz. PimpriChinchwad Municipal Corporation, Tukaram Nagar, Bhosari, Kasarwadi, Phugewadi, Dapodi, Bopodi, Khadki And Range Hill On Corridor-1 Of Pune Metro Rail Project. M/s HCC – AL FARA’A Joint Venture 01-11-2017 ₹ 4,97,09,15,237 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Misc-01/2017 Dt. 13.06.2017 Miscellaneous Works such as Shifting of Civil Utilities, Construction, Repair & maintenance of roads & drains, Demolition/Dismantling/Repair of old small Buildings, Construction of new small Buildings & Architectural Finishing Works, PHE works, Boundary Walls and any other Work assigned by Maha-Metro officials based on PWD SOR (Pune Region) for Pune Metro Rail Project (Phase-I) of Maharashtra Metro Rail Corporation Ltd. M/s Venus Buildtech India Pvt. Ltd. 14-09-2017 ₹ 12,97,41,483 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1DDC-02/2017 Dt. 29.06.2017 Detailed Design Consultancy Services for 12 (Twelve) Elevated Stations viz Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Mangalwar Peth, Pune Railway Station, Ruby Hall, Bund Garden, Yerawada, Kalyani Nagar and Ramwadi Excluding Viaduct in station portion on Corridor-2 of Pune Metro Rail Project. Consortium of M/s LKT Engineering Consultants Ltd. & M/s Architect Hafeez Contractor 14-09-2017 ₹ 4,79,88,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1C-02/2017 Dt. 07.04.2017 (Recall) Design and Construction of Elevated Viaduct of Length 7.150 Kms from CH:(-)625 to CH:6525 between Vanaz and Civil Court on the East-West Corridor of Pune Metro Rail Project M/s NCC Limited 16-08-2017 ₹ 3,48,20,00,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1SIA-01/2017 Dt. 26.04.2017 Appointment of Consultant for Carrying out “Social Impact Assessment (SIA) study and preparation of Social Management Implementation Plan, Rehabilitation & Resettlement (RR Policy) Plan” for Pune Metro Rail Project Consortium of M/s Centre for Market Research & Social Development Pvt. Ltd. and M/s Manavadhikar Samajik Manch. 24-07-2017 ₹ 16,80,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Consul-03/2017 Dt. 20.04.2017 Detailed Design Consultancy Services for 9 (Nine) Elevated Stations from PCMC to Range Hill Excluding Viaduct in Station Portion on Corridor-1 of Pune Metro Rail Project. M/s AYESA Ingenieria y Arquitectura, S.A.U (Ayesa) 22-07-2017 ₹ 4,95,28,179 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Consul-02/2017 Dt. 08.04.2017 Appointment of Consultant for Carrying out Environmental Impact Assessment (EIA) and Preparation of Environmental Mitigation Plan (EMP) for both the corridors (North-South and East-West) of Pune Metro Rail Project M/s RITES Limited 03-06-2017 ₹ 76,24,762 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1Consul-01/2017 Dt. 24.02.2017 APPOINTMENT OF CONSULTANT FOR CARRYING OUT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND HYDRAULIC STUDIES OF RIVER WITH REFERENCE TO THE PUNE METRO RAIL ALIGNMENT (1.7 KM) PASSING THROUGH MUTHA RIVER AND SUGGEST MEASURES TO MITIGATE THE SIDE EFFECTS. M/s MITCON Consultancy and Engineering Services Limited 13-05-2017 ₹ 1,24,90,000 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download
P1C-01/2017 Dt. 25.02.2017 Construction of Metro Corridor of Length 10.795 Km which includes: Design and Construction of Elevated Viaduct of Length 9.250 Kms from CH:(-)540 to CH:2600, CH:3600 to CH:6694, CH:7124 to CH:7709, CH:7737 to CH:8604 & CH:8691 to Ch:10255 between Pimpri Chinchwad Municipal Corporation and Range Hill and Construction of Elevated Viaduct on BOQ basis of Length 430m from CH:6694 to CH:7124 Near Harris Bridge, 1.000 Km from CH:2600 to CH:3600, 28m from CH:7709 to CH:7737 and 87m from CH:8604 to CH:8691 on the North-South Corridor of Pune Metro Rail Project. M/s NCC Limited 03-05-2017 ₹ 4,99,01,00,528 INR 864,71,39,476/- AND USD 37,595,867/- INR 164,79,29,657/- + USD 829,992/- + EUR 12,144,284/- INR 93,40,51,899.75/- + EUR 4,004,875.33/- INR 1,31,88,000/- AND INR 07,02,000/- INR 8,26,24,03,239/- + USD 40,571,099/-
Download Download