Pune Metro Rail Project

Shivaji Nagar Metro Station

About Station

Frist Underground Metro Station from Northern end of North South Corridor under package 1 is Shivaji Nagar UG Station. Station is constructed with typical cut & cover method consisting of platform level, concourse level and Grade level. Shivajinagar UG Station is shifted along the Station length by 35mts towards Southern side and partly moved in to the MSRTC land, improving the traffic management at Shivaji Road. It willprovide better connectivity with existing Shivaji Nagar bus stand and interchange with future planned corridor. Final station design includes four points of entry / exit points, connecting to Railway station, Bus Terminus and proposed Elevated corridor along Ganeshkind Road and also one entry catering to the neighbourhood.

360° View of Shivaji Nagar Metro Station

 

Landmark Near The Station